NEXCO CENTRAL (Central Nippon Expressway Company Limited)

Important Notice

Accepting refund applications for ETC system failures (only for customers paying by cash or credit card)

Mei-Nikan Expressway maintenance effect and Initiatives

Maintenance effect

The ring road connecting the north and south directions is strengthened, and it is expected that the traffic congestion will be alleviated.
Reduce congestion, eliminate passing traffic, and reduce travel time.
The more convenient and comfortable Mei-Nikan Expressway (Mei-Nikan Expwy) will change the business, sightseeing and urban tomorrow.

Opening effect② Alleviation of congestion inside the ring roadOpening effect② Alleviation of congestion inside the ring road

With the opening of Shin-Meishin Expressway and Isewangan Expwy, the opening of Centrair, and the port of Nagoya, which has handled nearly twice the volume of foreign trade containers in the past 10 years, the volume of traffic flowing into the Nagoya metropolitan area from the south side has increased. However, since the north-south traffic is currently supported by one of the Nagoya Expressway No. 3 Odaka Lines, traffic congestion has occurred due to traffic concentration.
The Nagoya Loop Line 2, along with the Nagoya Expressway No. 4 Tokai Line, will strengthen the north-south transportation axis and reduce traffic congestion.
現在After opening East / Southeast