NEXCO CENTRAL Corporate site




Outcome indicators for road management 2005

Effective and efficient business management using outcome indicators

Introducing easy-to-understand objective indicators from the customer's point of view, verifying the details of the efforts and their effects, and sufficiently analyzing the factors regarding the difference between the target value and the actual value, and improving services such as driving safety and regular driving performance To reflect.

Central Nippon Expressway Company Limited has introduced indicators that show the effects and outcomes (outcomes) generated by the implementation of the business, and are working to operate the business effectively and efficiently. Already announced in April "Challenge V-Tomorrow's Tomorrow-(Long-Term, Medium-Term, and Annual Management Plan)", business targets using outcome indicators, but this time, the actual values for fiscal 2005 have been compiled. I ’ll let you know.

safe and secure

Outcome indicators 定義 unit 2004
Actual value
2005
Actual value
comment 2006
Target value (reference)
Casualty rate (38KB) Number of fatalities and injuries per 100 million km of traveling vehicles Cases / 100 million kilometers 10.0 10.2 Maintain the current status by developing high-performance pavements, etc. Try to keep below the previous year and check regularly
Pavement maintenance rate (27KB) Lane extension ratio indicating soundness of paved road surface % 88 91 Repair required about 300km / lane required 93
Bridge pier reinforcement completion rate (23KB) Completion rate of piers requiring seismic reinforcement % 94 95 Completed reinforcement of about 30 piers requiring countermeasures 96

comfortable

Outcome indicators 定義 unit 2004
Actual value
2005
Actual value
comment 2006
Target value (reference)
ETC usage rate (22KB) Percentage of ETC users at tollgates with ETC installed % 37 59 Promotion by in-vehicle device purchase support and various campaigns 73
Lane regulation time due to road construction (30KB) Annual traffic regulation time associated with road work Time / (km / year) 87 59 Decrease due to completion of construction due to further consolidation of Tomei concentration construction restrictions and new service road connection Try to keep below the previous year and check regularly

Punctuality

Outcome indicators 定義 unit 2004
Actual value
2005
Actual value
comment 2006
Target value (reference)
Main line traffic jam loss time (93KB) User lost time due to mainline traffic congestion 10,000 units / hour / year 767 666 Reduction of main traffic congestion due to network development, etc. 664
Usage time securing rate (27KB) Percentage of time the road is available % 99.9 99.7 While the road closure time for construction was reduced, the current situation was maintained due to heavy snow Make efforts to exceed the previous year and check regularly

General

Outcome indicators 定義 unit 2004
Actual value
2005
Actual value
comment 2006
Target value (reference)
Customer satisfaction (16KB) Customer satisfaction related to maintenance management as determined by CS surveys, etc. 5-level evaluation 3.5 3.5 While the maintenance cost is reduced by 30%, the comfort of planting, etc. is reduced, while the ETC maintenance promotion promotes driving reliability. Make efforts to exceed the previous year and check regularly