NEXCO CENTRAL Drivers' site


Change in lane operation (main-substitution replacement at ramp)

Overview of countermeasure examples

Replacement of master and slave lamps

Ken-O Road immediately after the opening of the (Sagamihara Aikawa - Takao), but congestion in Ebina junction joining portion was occurring, Ken-O Road outer loop was change of the lamp that flows into the flow, which is the main, of traffic congestion Was reduced.

Change from guardrail to BOX beam (improvement of visibility)

Changed installation width of thin pavement

  • Return to the top of the page